Florida Fast Charging Stations: FPL Rates, Hurricane Siting and Rules

DC fast charging Florida business guide: FPL demand-limiter rates and Make-Ready Credit up to $50,000 per port, state preemption of local rules, 90-day permits.

Published
Reading time
5 min
Sources
7 references

At a glance

Local permit decision
Within 90 days (2025 rule)
FPL billed-demand rule
Lower of peak kW or kWh ÷ 75
FPL credit, 250 kW+ port
Up to $50,000
Mobile units, Milton 2024
50 kW, up to 11 sites

Key takeaways

  1. 1Florida law (s. 366.94) preempts charging-station regulation to the state: local governments must issue permits on state rules only, and under Rule 5J-28.002 (effective 1 May 2025) must decide within 90 days of a complete application.
  2. 2FPL offers voluntary public-charging rates (GSD-1EV, GSLD-1EV, GSLD-2EV) on a dedicated meter; billed demand is the lower of actual peak kW or monthly kWh divided by 75, so a low-utilisation site is not billed on its full peak.
  3. 3FPL's Make-Ready Credit covers utility-side costs only: up to $20,000, $30,000 or $50,000 per DC port by charger size (50–149, 150–249, 250 kW and up), first come, first served.
  4. 4Hurricanes decide how you site and equip a site: the state put temporary 50 kW units on the I-75 evacuation corridor for Hurricane Milton in 2024. For US sites only our UC and SC series have North American builds.
DC fast chargers with electric cars at a charging site
On this page
  1. 01Who can regulate your charger
  2. 02How the electricity is billed
  3. 03Money toward the connection
  4. 04Designing for hurricanes
  5. 05Where the demand is
  6. 06How EVCSTAR equipment fits

Short answer: a DC fast-charging business in Florida works under unusually light local regulation, because state law preempts city and county charger rules, so the real variables are your utility’s demand-charge treatment (FPL has a dedicated public-charging rate and a make-ready credit up to $50,000 per port) and how well the site survives a hurricane.

Who can regulate your charger

The state, not the city: Florida took charging-station regulation away from local governments. Under s. 366.94 (2025 statutes), “the regulation of electric vehicle charging stations is preempted to the state”, and local governments must issue permits “based solely upon standards established by department rule” of the Department of Agriculture and Consumer Services. Rule 5J-28.002, adopted 15 April 2025 and effective 1 May 2025, turns that into concrete limits.

Topic What the rule says
Number of chargers or EV spaces Local governments may not set a minimum or maximum
Parking counts EV spaces count toward local parking requirements
Zoning Accessory use in all districts; primary use in commercial and industrial districts, unless health or safety concerns
Timing Permit decided within 90 days of a complete application; missing items flagged within 30 days or the application is treated as complete
Inspection Limited to safety requirements

A charger serving the public must also be registered with the department before it goes into service, and the department can inspect and fine. The statute also makes it an infraction to park a non-charging vehicle in a charging space. One more point to note: s. 366.94(1) says selling charging to the public is not a retail sale of electricity, so your price per kWh is not utility-regulated.

How the electricity is billed

For a fast-charging site the bill is mostly about demand, and FPL has built a rate for exactly that. FPL’s voluntary EV demand-limiter rates are for public charging on a dedicated meter. Enrolment is manual, by phone, after the account is live.

Schedule Measured demand Note
GSD-1EV 25–499 kW Most single-site fast chargers
GSLD-1EV 500–1,999 kW Large hubs
GSLD-2EV 2,000 kW and up Applies once set up in FPL billing; until then GSLD-1EV

Billed demand is the lower of your actual peak or your monthly kWh divided by 75. FPL’s own example: at 30,000 kWh a month the kWh figure is 400 kW, so a 300 kW peak is billed at 300 kW. The effect is a temporary discount that phases out as utilisation grows; above 499 kW you move to the next class for at least 12 months. FPL’s third-party charging page describes these as pilot riders, so confirm the current status and the actual rates in its tariff book. Put the result into the payback calculator as separate demand and energy lines, and use OCPP smart charging to cap peaks.

Money toward the connection

FPL pays toward utility-side work, not toward the charger. Its Make-Ready Credit, open in all FPL areas and first come, first served, lists these maximums:

Charger nameplate Credit per port Site cap
50–149 kW up to $20,000 $120,000
150–249 kW up to $30,000 $180,000
250 kW or more up to $50,000 $300,000

Qualifying costs include service lines, transformers, switchgear, conduit, wiring, trenching and pads; chargers, customer-side equipment and maintenance are excluded. The page gives no total budget or deadline, so ask FPL whether funds remain. Public fast chargers are 50 kW and above; Level 2 gets up to $1,200 per port. For Duke Energy Florida and Tampa Electric we could not read current programs (see the FAQ), so treat any figure for those territories as unknown until the utility confirms it.

Designing for hurricanes

Plan for the storm as a standing operating condition, not an exception. After Hurricane Milton in 2024, the Florida Division of Emergency Management installed up to ten temporary 50 kW single-port mobile chargers on the I-75 evacuation corridor plus one near I-4, at park-and-ride lots and a travel centre. That tells you where evacuation demand concentrates: inland, along the north-south corridors. For your own site, these are engineering questions to settle with the local floodplain administrator and your designer, since we found no official Florida siting standard for chargers:

  • Check the FEMA flood zone and base flood elevation, and mount equipment and switchgear above it.
  • Choose enclosures and anchoring for wind loads, and keep trees and signs clear of the cabinet.
  • Ask the utility how fast restoration is prioritised for your feeder; a charger without grid power is idle, so some operators add a generator connection point.
  • Keep remote monitoring so you can power down before a storm and confirm status after.

Where the demand is

The hurricane lesson and the highway lesson are the same: long corridors and inland evacuation routes. Evacuation traffic runs on I-75 and I-4, and a corridor site near a travel centre also serves everyday long-distance traffic. Retail and hospitality sites in tourist metros need a different case: long dwell, lower power may pay back. We have not verified Florida charging volumes or competitor counts, so test your own site with the grid capacity calculator and local traffic counts.

How EVCSTAR equipment fits

For US sites in this range, only the UC series (60–360 kW) and the SC series (15–30 kW) have North American builds, with 480 V input and CCS1 or NACS connectors. UC suits corridor and retail fast-charge sites and shares power between guns; SC suits small connections such as fleet yards. Both support OCPP 1.6J and 2.0.1 and operate to +55 °C, which matters on a Florida summer slab. We cannot state that a model holds a UL or ETL listing or meets any Florida registration or grant requirement: tell us the project and we will send the technical documents and test reports we can supply, and you should confirm with FPL, your inspector and the state department before ordering. See our standards guide for the US standards in outline.

Payback calculator

Example values are filled in — replace them with your own quotation, tariff and traffic figures.

Energy sold per month
—
Net margin per month
—
Simple payback
—

Simple payback = total investment ÷ (energy sold × (price − energy cost) − fixed costs), using 30 days per month. Taxes, financing, subsidies and utilisation growth are not included.

Frequently asked questions

Can a Florida city or county block my fast-charging site with its own rules?
Largely no. Section 366.94 says regulation of charging stations is preempted to the state, and Rule 5J-28.002 bars local rules or permit conditions that set a minimum or maximum number of chargers or EV spaces. Cities can still issue electrical permits on safety standards and run their own charging. The rule also says all charger levels are accessory use in every zoning district and primary use in commercial and industrial districts, unless health or safety concerns exist. Check the current rule text with your permitting office.
Does a public charger in Florida have to be registered?
Yes. Section 366.94(3) requires a charger serving the public to be registered with the Department of Agriculture and Consumer Services on its form before it is placed in service. The department may inspect, investigate and fine. Ask the department for the current form and any technical requirements before ordering equipment.
How does FPL bill a DC fast-charging site?
A new commercial account starts on a general service schedule and moves by measured demand. Public charging on a dedicated meter can enrol (by phone) in GSD-1EV (25–499 kW), GSLD-1EV (500–1,999 kW) or GSLD-2EV (2,000 kW and up). Billed demand is the lower of actual peak or monthly kWh divided by 75, and the benefit fades as utilisation rises. Per-kW and per-kWh values are in FPL's tariff book, which we did not read, so get a written estimate from FPL.
What about Duke Energy Florida and Tampa Electric?
We could not open a current Duke Energy Florida or Tampa Electric commercial EV rate or credit schedule. Tampa Electric's EV page lists no business charging rebate or EV rate and points to its tariff book and ev@tecoenergy.com; Duke's pages blocked our request. Ask each utility for its current make-ready, rebate and demand-charge terms before choosing between sites in different territories.

References

  1. [1]Florida Statutes 2025, s. 366.94 Electric vehicle charging stations. The Florida Senate.
  2. [2]Rule 5J-28.002 Local Government Entities. Florida Department of Agriculture and Consumer Services (via Cornell LII).
  3. [3]FPL EVolution Make-Ready Credit Program. Florida Power & Light.
  4. [4]Electric vehicle FAQ (demand limiter rates). Florida Power & Light.
  5. [5]EV for business: third-party charging. Florida Power & Light.
  6. [6]Florida mobile charging for Hurricane Milton evacuation. Joint Office of Energy and Transportation, 8 October 2024.
  7. [7]Our commitment to electric vehicles. Tampa Electric.

Chargers on this page

  • DC fast · floor-standing

    EVCSTAR UC Series floor-standing DC fast charger with two charging cables on top-mounted holders

    UC Series

    60–360 kW

    Two guns, one cabinet, power shared by demand — for highway hubs and high-traffic sites.

    CCS2 + CCS2 / CHAdeMO (EU) · CCS1 + CCS1 / CHAdeMO / NACS (NA)

    Specs & options of UC Series →
  • DC wallbox / pedestal

    EVCSTAR SC Series compact wall-mounted DC charger with one CCS charging cable

    SC Series

    15–30 kW

    A slim wall-mounted DC unit, 15–30 kW, one CCS1 or CCS2 gun.

    CCS2 · CCS1

    Specs & options of SC Series →

Tell us about your charging site

Share the site type, number of bays and grid capacity — our engineers will recommend a charger configuration.

Request a Quote